CenerTech hands out engineering deal for SK’s Lufeng FPSO
The floater is scheduled for completion in July 2023, one month ahead of first oil at Lufeng 12-3 field in the South China Sea.
The floater is scheduled for completion in July 2023, one month ahead of first oil at Lufeng 12-3 field in the South China Sea.