One industry source goes so far as to claim that US regulators are leaning toward requiring that BOPs be equipped with two blind shear rams spaced apart to lessen the chance of having to shear with the tool joint caught across them in an emergency.

“Some operators would like a seven-ram BOP configuration and others are happy with six,” says Cor Selen, chief executive of Maersk Drilling USA in Houston.