Subsea tree providers are also jostling for position to secure a possible $800 million contract covering 30 to 35 production wells, with about the same number in future phases.

In a major blow for floater contractors, industry sources said the US operator does not need a floating production system for Prosperidade’s initial phase — and it could be another 10 years before a surface vessel is required.

Gas