A
successful
sidetrack
appraisal
at
the
field
extended
the
oil/water
contact
down
structure
by
about
700
feet,
confirming
an
extension
of
the
field
by
up
to
1500
acres,
according
to
Anadarko.
The
results
confirm
resource
potential
at
Heidelberg
of
more
than
200
million
barrels
of
oil
equivalent.
Heidelberg
is
in
Green
Canyon
blocks
859,
860,
903,
904
and
948.
Anadarko
has
pre-front-end
engineering
and
design
work
ongoing
on
the
Heidelberg
spar.
Official
sanction
of
the
project
is
expected
in
early
2013.
Heidelberg
will
be
Anadarko’s
eighth
operated
spar.
Anadarko
has
a
spar
under
construction…