Log in or start a trial to access this article

Heerema set to win MonArb topsides

Heerema Fabrication Group is on the verge of landing a coveted fabrication contract for the 7500-tonne topsides for Talisman Energy’s $2.5 billion MonArb bridge-linked platform project in the UK.