The
newbuild
unit
listed
by
as
much
as
seven
degrees
after
taking
in
seawater
in
a
ballast
tank
while
drilling
the
Salina
wildcat
in
the
Barents
Sea
for
operator
Eni,
according
to
the
Petroleum
Safety
Authority’s
(PSA)
own
probe
into
the
4
September
incident.
Eni
concluded
in
its
own
investigation
that
a
“lack
of
competence”
was
to
blame
for
the
listing,
stating
that
the
control
room
operator
at
the
time
lacked
the
required
expertise
to
handle
the
ballasting
operation.
It
its
latest
indictment
of
Saipem
over
the
incident,
the
PSA
has
ordered
the…