"Britannia
facilities
resumed
full
production
on
Sunday
27
January
2013,"
a
spokeswoman
for
Chevron
told
Reuters.
The
platform
had
been
shut
down
as
a
precaution
on
16
January,
the
operator
said
previously,
without
giving
a
specific
reason.
Chevron
and
ConocoPhillips
jointly
operate
the
facility,
which
usually
produces
between
6.5
million
and
6.8
million
cubic
metres
per
day
of
gas.
The
platform
is
located
around
210
kilometres
north-east
of
Aberdeen.
…