You will take on a Project Management lead role and be responsible for managing and delivery within budget. You are to deliver Prospect projects, using your own technical expertise and experience in Engineering Design and Computational Analysis as well as group-wide technical support.
Design and specification of hydraulic systems for marine and offshore cranes.
Calculations in accordance with the regulations of the classification companies.
Follow-up of workshops and subcontractors at home and abroad.
Participation in design and product development for our projects.
You will report to the Principal Engineer, you will support the execution of Prospect projects, using your own technical expertise and experience in Engineering Design, Computational Analysis as well as group-wide technical support.
In this key role, you’ll have an important part to play in the wide range of new Oil and Gas developments we’re rolling out across the globe. And when you realise the scale and scope of what will often be $multi-billion projects, you’ll understand what an exciting opportunity that presents. Providing technical process engineering support, the challenges you’ll face will be as diverse as the projects you’re involved in. As well as working closely with Development Managers and Subsurface professionals to make the most of our existing sites and develop new proposals, you’ll oversee the work of contractors from conceptual studies all the way through to the detailed design stage. You’ll also contribute significantly to the development of less experienced colleagues.
In this key role, you’ll have an important part to play in the wide range of new Oil and Gas developments we’re rolling out across the globe. And when you realise the scale and scope of what will often be $multi-billion projects, you’ll understand what an exciting opportunity that presents. Providing technical expertise on every aspect of Process Control, the challenges you’ll face will be as diverse as the projects you’re involved in. As well as working closely with Development Managers and Subsurface professionals to make the most of our existing sites and develop new proposals, you’ll oversee the work of contractors from conceptual studies all the way through to the detailed design stage. You’ll also contribute significantly to the development of less experienced colleagues.
Australia's Oilex said it was making steady progress with the drilling of two wells at its production sharing contracts in Indonesia and India.
Oilex said it was making preparations to drill ahead at the Pendalian-3 well at the West Kampar PSC in central Sumatra, Indonesia.
Drilling is scheduled to take 13 days after which the well will be cased and a comprehensive 14-day multi-zone testing programme will begin.
Oilex has a 45% interest in the West Kampar PSC, alongside operator Sumatera Persada Energi (55%).
Oilex also said it had competed mobilisation of the drilling rig at the Bhandut-2 well at the Bhandut PSC, India.
The well will be re-entered and abandoned prior to commencing the Bhandut 2Z appraisal/production well.
Oilex has a 40% stake in the Bhandut PSC, with operator Gujurat State Petroleum Corporation holding the remaining 60%.