The fractured basement specialist said well 205 21a-7Z achieved a sustainable flow rate of 14,500 stock tank barrels of oil per day, with no produced formation water.

“The flow rate was constrained by the test equipment,” Hurricane said of a well that was drilled by the semi-submersible Transocean Spitsbergen.

“The horizontal sidetrack well will be suspended for use as a future producer, providing a second production well ahead of the early production system (EPS) phase of development.”

Shares