The Houston-based player will perform the study into the proposed LNG hub terminal at Probolinggo in Easy Java for PT Australasia LNG Indonesia (AALNG).

The pre-FEED study is set to take about 10 weeks and will look at the provision of onshore LNG regasification and truck loading distribution facilities.

“The pre-FEED study will be further developed for subsequent implementation phases to meet a throughput capacity of 3 million tonnes per annum (of LNG),” KBR said.

“The