Equinor hits market with inquiry for topsides work on huge new Bay du Nord FPSO

Topsides study will be a critical in designing concept needed for a "low maintenance" facility sited 500 kilometres offshore

To be revamped: Saltship's original design for the hull of Bay du Nord FPSO
To be revamped: Saltship's original design for the hull of Bay du Nord FPSOPhoto: EQUINOR
Published 8 November 2021, 17:26Updated 9 November 2021, 22:44