Petrobras targets new FPSO for Campos basin pre-salt reservoir

Proposed floater is still in the early evaluation stage and a tender is not expected until 2027

Petrobras engineering, technology and innovation director Renata Baruzzi.
Petrobras engineering, technology and innovation director Renata Baruzzi.Photo: ARMANDO PAIVA/PETROBRAS
Published 17 September 2025, 10:58Updated 17 September 2025, 13:26
BrazilPetrobrasRenata BaruzziAlbacoraCampos basin