All change: how the original Pecan project off Ghana would have looked Photo: AKER ENERGY

Aker Energy in talks over new Pecan FPSO as it eyes second vessel for Ghana block

Norway-based player in talks with contractors over redeployable floating production, storage and offloading vessel

10 June 2020 11:13 GMT Updated  14 June 2020 14:33 GMT
 in    London