Malaysia’s Ranhill Worley has won a $27 million contract to provide detailed engineering services for the newbuild P-82 floating production, storage and offloading vessel that Sembcorp Marine is constructing for Petrobras’ Buzios ultra-deepwater field development offshore Brazil

Ranhill Worley has been tasked to provide topsides engineering services for the detailed design and follow-on phases of this floater project. The P-82 FPSO’s topsides will comprise around 20 modules with combined dry weights of 46,600 tonnes and be equipped with facilities including power generation, CO2 removal and compression, oil processing and produced water treatment, utilities, a vapour recovery unit system, flare system, chemical and storage, gas injection, gas lift and water injection.