The first engineering step in TechnipFMC’s 20k subsea equipment programme was limit-testing of materials and seals to see which would best cope with the extreme high-pressure, high-temperature conditions, writes Kathrine Schmidt. Through much of 2013 and 2014, the company booked up huge capacity in