At 1300 metres, Total’s Girassol project off Angola was considered the first ultra-deepwater field when it came on stream in 2001. Today, deepwater fields are being developed at more than twice that water depth, while Girassol and other projects of its generation are reaching late maturity and inevitable production declines.

Operators have adopted a number of strategies to enhance recovery and extend field life at ultra-deep installations.