Trevor Smith, WJM vice president of drilling facilities engineering, says the company’s design engineers “deliberately downsized the individual modules so they could function like a set of interlocking building blocks and be lifted in-place by ‘leapfrog’ cranes. This solution enables the modular rig to be configured for drilling and integrated production below, while providing significant cost savings in deployment.”

The rig has two main modules.