The contracts cover the rehabilitation of various subsea oil gathering and high pressure gas and condensate lines, varying in lengths from 700 metres up to 3500 metres.

APS said it would install its InField Liner technology on the lines which it said would act as a corrosion barrier and extend the pipelines beyond their original design life.

The company previously piloted the technology at Petronas' Samarang field in 2013 and carried out a commercial trial at the West Lutong field late last year.

APS