Dubbed the Hammerhead system, the technology was developed in a broad-based integrated fashion to handle upper and lower completions, high-volume and multi-zone fracturing as well as real-time monitoring and production optimisation over 20 years.

In addition, the system is touted as having the capability to contribute to increasing recovery by least 2% in a play where average recoveries are only 6%, and explorers grapple with pressures as high as 25,000 psi and temperatures up to 300F.

"The