The Italian major will initially start output from the cylindrical floating production platform at a reduced rate before soon pushing for a resumption of full production.
"Eni Norge is preparing to resume production on the Goliat field in the next few days," a spokesman for the operator told Upstream.
"Maximum production capacity is expected to be reached soon after, with full re-injection of gas and produced water."
Goliat