Statoil lost control of the well on Saturday morning local time but was able to secure it with the rig's blowout preventer. It is now working to stabilise pressure in the well.

"Personnel without work assignments in connection with the incident will now be removed from the rig," Statoil said in a statement on Saturday.

"There were 107 people on board when the incident occurred.