The rig, transferred in Ghana waters, will take three weeks to reach Namibian waters, and then undergo an additional 21 days of testing.
The goal is to get the rig on location and prepared to drill the Wingat prospect in the Walvis basin by the end of the first quarter, HRT said.
Wingat lies in about 1000 metres of water in the PEL-23 block.