The London-listed company said on Monday that the KSG-66 well (previously referred to as KPL-3E-4) was placed onto production at an initial gross rate of 81 barrels per day.

Mud log shows and formation pressure data had identified a total net pay of 50.31 metres, with 30.33 metres appearing to be oil bearing, Jubilant reported.

An up-hole potential of about 26.83 metres of net oil bearing sands and 19.98