Well KPL-B, located in the southern area of the field to the south-west of well KSG 55 and north-west of KSG 62, is expected to take up to five weeks to drill to its target depth of 1400 metres.
The well will be deviated by about 686 metres to the south from the existing plinth of well KSG 40, with the aim of appraising the S-00 reservoir sands with a secondary objective of appraising the M-00 and T-00 sand layers.
Jubilant’s