The company carried out a production test over the Maastrichtian A and B oil bearing reservoirs, with pressure build up continuing over a 12-hour period.

The drill stem test over the Maastrichtian A produced a rate of 3700 bpd, while the Maastrichtian B produced at a rate of 3360 bpd.

Karoon then shut in the well for a 57-hour pressure build-up period.

A