After completing milling operations on the well in April, an influx of fracture sand caused the milling assembly to packoff and the drill pipe to part down hole, Oilex said in its quarterly report.
The company had been trying to recover the damaged drill pipe and milling assemblies since then, but the pipe had parted on three separate occasions while attempts were made to pull out with the drilling assembly.
“The