Cooper said on Friday that the oil development probe Callawonga-9 encountered a minimum of six metres of gross oil column in the McKinlay Member and the Namur sandstone, with at least four metres of net oil pay.
The probe was spudded in permit PEL 92 last weekend and was drilled to a total depth of 1703.5 metres. It has now been cased and suspended for completion as an oil producer and is expected to be connected to the existing Callawonga production facilities.
“Callawonga-9