Located about 600 metres north west of the Cuisinier 1 discovery well on the same project area, the well will be drilled to a total depth of 1759 metres, targeting oil bearing sands of the Murta Member.
As of Tuesday morning, the well had reached a depth of 312 metres and a 9.625 inch surface casing had been set before drilling ahead continued.