The London-listed company said on Monday that the TE-6 well was drilled to a measured vertical depth of 2665 metres and encountered approximately 28 metres of net gas pay in the TAGI reservoir.

The results "are already significantly above Sound's expectations as a significant stable flow has already been achieved, despite only having accessed so far 18% of the total reservoir and no stimulation having yet been performed", the company said. 

After