The well flowed gas from the C sand during testing at rates of between 700,000 and 950,000 cubic feet per day with associated water rates ranging from 950 to 1500 barrels per day.
Transerv noted on Monday the well did not need a jet pump to maintain flow, while in-well pressure and temperature logging was successfully carried out while the well was flowing to determine the nature and source of the reservoir fluids.
The