Rigs_and_VesselsBomesc cuts first steel on topsides of Equinor's huge Brazil-destined floaterOnce delivered in October next year, the modules will be shipped to Singapore for integration with hull at Keppel ShipyardLift-off: Equinor, Modec and Bomesc executives start the cutting of first steel on the Bacalhau floater topsidesPhoto: BOMESCXu YiheSingapore