Brazil-bound Mero floater hull ready for topsides integration in China

Arrival of Sepetiba FPSO on Sunday will see Bomesc deliver the floater in March 2022

Arriving: the Sepetiba FPSO hull is to be interfaced with topsides at Bomesc yard in Tianjin
Arriving: the Sepetiba FPSO hull is to be interfaced with topsides at Bomesc yard in TianjinPhoto: CMHI
Published 27 July 2021, 10:51Updated 27 July 2021, 11:14