P-71 FPSO sets sail for Petrobras’ Itapu pre-salt field

Floater is expected to start production in December

Heading for location: the P-71 FPSO leaving the EJA shipyard on its way to the Itapu pre-salt field.
Heading for location: the P-71 FPSO leaving the EJA shipyard on its way to the Itapu pre-salt field.Photo: PETROBRAS
Published 17 October 2022, 15:05Updated 19 October 2022, 10:13