Rigs and VesselsP-71 FPSO sets sail for Petrobras’ Itapu pre-salt fieldFloater is expected to start production in DecemberHeading for location: the P-71 FPSO leaving the EJA shipyard on its way to the Itapu pre-salt field.Photo: PETROBRASFabio PalmigianiRio de Janeiro