Santos revisits Barossa floater contract with Modec

Australian operator in talks with Modec to revive contract for developing gas condensate field in Timor Sea

Future floater: a rendering of the Barossa FPSO, a pioneering application of Modec's M350 hull design, to be built by China's Dalian Shipbuilding Industry Corporation
Future floater: a rendering of the Barossa FPSO, a pioneering application of Modec's M350 hull design, to be built by China's Dalian Shipbuilding Industry CorporationImage: MODEC
Published 28 October 2020, 23:03Updated 29 October 2020, 01:28