Joint venture partner Far Ltd revealed on Tuesday the well had been re-entered and would be drilled to a total depth of about 2782 metres and is expected to be followed by an extensive evaluation programme involving coring, logging and flow testing.

The top of the SNE-3 well was drilled last year to a depth of 1755 metres before the rig was moved to drill the SNE-2 well which successfully flowed at a constrained 8000 barrels per day during recent testing.

The