The drill stem test on the Mzia-3 appraisal well, in about 1800 metres of water and six kilometres north of the original Mzia-1 discovery well, resulted in sustained production peaking at 101 million cubic feet per day of gas.
In May 2013, a flow test on the Mzia-2 well, the first done on a Cretaceous discovery in deep water off Tanzania, flowed at an equipment-constrained rate of 57 MMcfd.
Sami