With problems occurring during the first stage of stimulation at the Boston-3 well, Beach is keen to find a solution for the 10-stage stimulation of the Boston-2 wells.
The joint venture partners of ATP 855 are re-designing a stimulation programme which could include pumping stimulation fluid down a tubing string, similar to what was done in the Holdfast-1 and Encounter-1 wells.
In