Fabrication of the field platform’s topsides and jacket is being closely watched by the industry due to the perceived risk of cost overruns and delays after the contracts were won by foreign yards.
The project is also under intense scrutiny from the Petroleum Safety Authority (PSA), which carried out a recent audit of engineering work on the topsides being carried out by Mustang Engineering in the UK for Singapore-based builder SMOE.
The