The company reported to the Australian Securities Exchange on Monday that the sidetrack well, Ungani-1ST1 was shut-in during November and December for pressure monitoring after both it and the Ungani-2 well were installed with downhole pressure gauges.
A production test was expected to continue at Ungani-2 while the sidetrack well was down.
However, the company was required to facilitate a short shut-in of Ungani-2 after encountering minor mechanical problems with the oil load-out pump.
As