The Malolos-1 well, located in the company’s 100%-owned Service Contract 44, was originally drilled in 1960. Light crude oil was recovered on several drill stem tests over a gross interval of 2185 metres to 2233 metres.

Gas2Grid tried to re-enter the well but operations were suspended in late 2011 due to a blockage caused by the original cased hole testing equipment.

Work