The UAE-based builder has remained mum, however, on the contract price for the LeTourneau-design, self-elevating Super 166E-class unit.
Jindal also has an option for a second rig at Lamprell, exercisable within six months of the original order becoming effective.
The unit will be built at Lamprell’s Hamriyah facility. It will be able to operate in water depths of up to 350 feet and drill to depths of 30,000 feet.
In