The FPSO is scheduled for a first-quarter 2014 start-up at module four of the Roncador heavy-oil field in Brazil's Campos basin.
The P-61 tension-leg wellhead platform (TLWP), the first of its kind built in Brazil, is also scheduled to be on the move starting Tuesday to the Pappa Terra heavy-oil field, also in the Campos basin. It will join the P-63 FPSO there, which drew first oil in November.
Petrobras