The project was singled out in Petrobras’s presentation of third-quarter results on Monday as a drag on the company’s production curves due, the company said, to ongoing installation problems with the submerged riser buoys.

The first pair of buoys are being installed in conjunction with the floating production, storage and offloading vessel FPSO Cidade de Sao Paulo, located on the Sapinhoa field.

The