The offshore option will be compared with an alternative study that focuses on onshore processing of the field’s output.
Technip will carry out the offshore processing study, which is expected to last at least six months, in Malaysia on a proposed multi-platform development to separate CO2 from K5 gas after it is extracted for re-injection into producing or depleted oil and gas fields up to 250 kilometres away from Bintulu.
This