The company revealed on Monday a drill stemtest in the top of the Upper Berai zone flowed at a maximum rateof 32.1 million cubic feet of gas per day and 296 barrels of condensate per dayfrom a 199-metre interval.

This follows on from aninitial successful drill stem test which flowed at a maximum 18.6 MMcfd of gas and 181 bpd of condensate from a 70-metreinterval in the deeper Upper Berai zone.

The