Wireline logs and pressure surveys confirmed 119 metres of net pay in a gas-bearing reservoir in the well at the Bangkanai production sharing contract onshore Indonesia.
Salamander completed the well as a future producer following a completion testing programme.
Gas was encountered in the Middle Miocene sands, Ogliocene Upper Berai and Lower Berai formation carbonates and the Eocene Tanjung formation sandstones.
A drill stem test flowed at a maximum rate of 18.6