The company will supply flexible pipes for the Sapinhoa Norte field and the I5 at Lula field in water depths of up to 2500 metres.

About 100 kilometres of flexible pipes for oil production, gas lift, and gas injection.

The deal also includes related equipments for the pre-salt area to be installed on the Cidade de Angra dos Reis and Cidade de Ilhabela floating production storage and offloading units.

The