Total intends to drill a well on the Aquio block and two on the Ipati block, as well as installing a gas-processing plant and pipelines that will pave the way for exports, the company adeed.

The ICS-2 well was drilled to a depth of 5636 metres in the Ipati block and found "a hydrocarbon column of around 1100 meters in the Devonian Huamampampa fractured sandstones reservoir."

“The