It was installed in 1984 in 150 metres of water, far shallower than any subsequent TLP, writes Adrian Cottrill.
Hutton also used a tendon deployment and attachment approach that was rapidly superseded. All other TLPs, except Norway’s Snorre, placed in 1992, have connected their tendons at external porches on the hull. The tendon elements for Hutton and Snorre were connected and deployed from manned chambers inside their four corner columns.
The