At 3000 tonnes, the loadout is reportedly one of the largest to date in Vietnam. The FPSO will serve the Petrobras-operated Libra field in Brazil’s Campos basin.
Brazil bound
BRAZIL BOUND: The external cantilever turret for the FPSO Pioneiro de Libra left the Triyards SOFEL fabrication yard, in Vietnam, for Jurong Shipyard in Singapore, where it is being integrated into the FPSO.
16 September 2016 0:00 GMT
Updated
16 September 2016 0:00 GMT